DL/T5210.2-2009电力建设施工质量验收及评价规程第2部分:锅炉机组(英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

4.14 Equipment and pipes painting of the whole plant

4.14.1 Painting of equipment and pipe insulation trowel finish surface layer.

1 Scope:painting of equipment and pipe insulation trowel finish surface layer.

2 Quality criteria and inspection methods are shown in Table 4.14.1.

Table 4.14.1 Painting of equipment and pipe Insulation trowel finish surface layer

img

4.14.2 Painting of equipment and pipe metal surfaces.

1 Scope:painting of equipment and pipe metal surfaces.

2 Quality criteria and inspection methods are shown in Table 4.14.2.

Table 4.14.2 Painting of equipment and pipe metal surfaces

img

4.14.3 Pasting of glass wool cloth of equipment and pipe trowel finish coat.

1 Scope:pasting of glass wool cloth of equipment and pipe trowel finish coat.

2 Quality criteria and inspection methods are shown in Table 4.14.3.

Table 4.14.3 Pasting of glass wool cloth of equipment and pipe trowel finish coat

img

4.14.4 Asphalt mastic coating of metal pipes.

1 Scope:asphalt mastic coating of metal pipes.

2 Quality criteria and inspection methods are shown in Table 4.14.4.

Table 4.14.4 Asphalt mastic coating of metal pipes

img

4.14.5 Anti-corrosion of wrapping glass wool cloth of metal pipe outer layers.

1 Scope:anti-corrosion of wrapping glass wool cloth of metal pipe outer layers.

2 Quality criteria and inspection methods are shown in Table 4.14.5.

Table 4.14.5 Anti-corrosion of wrapping glass wool cloth of metal pipe outer layers

img

4.14.6 Painting of glass wool cloth surface layer of equipment and pipes

1 Scope:painting of glass wool cloth surface layer of equipment and pipes.

2 Quality criteria and inspection methods are shown in Table 4.14.6.

Table 4.14.6 Painting of glass wool cloth surface layer of equipment and pipes

img

4.14.7 Implementation checklist of mandatory provisions of painting of equipments and pipes in boiler room,steam turbine house,fuel oil pump room,air compressor room,water circulating system,desulfurization zone and denitrification zone.

1 Scope:implementation inspection of mandatory provisions of painting of equipments and pipes in the boiler room,steam turbine house,oil pump room,the air compressor room,water circulating system,desulfurization zone and denitrification zone.

2 The implementation of mandatory provisions shall meet the requirements of Table 4.14.7.

Table 4.14.7 Implementation checklist of mandatory provisions of painting of equipments and pipes

img

Note:contents in this Table may be added or deleted properly according to actual situations.

4.14.8 Implementation checklist of mandatory provisions of painting subsection project of water treatment treatment equipment and pipes.

1 Scope:implementation inspection of mandatory provisions of painting of water treatment and hydrogen production equipment and pipes.

2 The implementation of mandatory provisions shall meet the requirements of Table 4.14.8.

Table 4.14.8 Implementation checklist of mandatory provisions of painting subsection project of water treatment treatment equipment and pipes

img

Note:contents in this Table may be added or deleted properly according to actual situations.