4.5 Erection of Boiler Dust Precipitator

4.5.1 Support erection.

1 Scope:erection of electrostatic precipitator supports.

2 Quality criterias and inspection methods are shown in Table 4.5.1.

Table 4.5.1 Support erection

img

4.5.2 Assembly and erection of electrodes.

1 Scope:assembly and erection of electrostatic precipitator electrodes.

2 Quality criterias and inspection methods are shown in Table 4.5.2.

Table 4.5.2 Assembly and erection of electrodes

img

Table 4.5.2(Continued)

img

Table 4.5.2(Continued)

img

Table 4.5.2(Continued)

img

Note:a In anode plates and frame erection verticality indexes quality criteria,L represents anode plate or cathode frame height.

4.5.3 Erection of distribution and partition plates.

1 Scope:erection of distribution and partition plates of electrostatic precipitator.

2 Quality criterias and inspection methods are shown in Table 4.5.3.

Table 4.5.3 Erection of distribution and partition plates

img

4.5.4 Erection of vibration and transmission devices.

1 Scope:erection of vibration and transmission devices of electrostatic precipitator.

2 Quality criterias and inspection methods are shown in Table 4.5.4.

4.5.4 Erection of vibration and transmission devices

img

4.5.5 Erection of electromagnetic vibration device.

1 Scope:erection of electromagnetic vibration device of electrostatic precipitator.

2 Quality criterias and inspection methods are shown in Table 4.5.5.

Table 4.5.5 Erection of electromagnetic vibration device

img

Table 4.5.5(Continued)

img

4.5.6 Subsection trial operation of vibration and transmission devices.

1 Scope:subsection trial operation of vibration and transmission devices of electrostatic precipitator.

2 Quality criterias and inspection methods are shown in Table 4.5.6.

Table 4.5.6 Subsection trial operation of vibration and transmission devices

img

4.5.7 Erection of rotating injection devices.

1 Scope:erection of bag filter rotating injection devices.

2 Quality criterias and inspection methods are shown in Table 4.5.7.

Table 4.5.7 Erection of rotating injection devices

img

4.5.8 Erection of tube sheet.

1 Scope:erection of bag filter tube sheet.

2 Quality criterias and inspection methods are shown in Table 4.5.8.

Table 4.5.8 Erection of tube sheet

img

Table 4.5.8(Continued)

img

4.5.9 Erection of filter bag and bag cage.

1 Scope:erection of filter bag and bag cage.

2 Quality criterias and inspection methods are shown in Table 4.5.9.

Table 4.5.9 Erection of filter bag and bag cage

img

4.5.10 Erection of vibration driving device.

1 Scope:erection of vibration driving device of bag filter.

2 Quality criterias and inspection methods are shown in Table 4.5.10.

Table 4.5.10 Erection of vibration driving device

img

4.5.11 Foundation lineation and pad iron erection record.

1 Scope:foundation lineation and pad iron erection of dust precipitator.

2 The record shall meet the requirements of Table 4.5.11.

Table 4.5.11 Foundation lineation and pad iron erection record

img

4.5.12 Steel structure erection record.

1 Scope:the erection record of steel structure of dust precipitator.

2 The record shall meet the requirements of Table 4.5.12.

Table 4.5.12 Steel structure erection record

img

4.5.13 Certification of trial operation of electromagnetic vibration devices.

1 Scope:electrostatic precipitator electromagnetic vibration devices.

2 Certification shall meet requirements shown in Table 4.5.13.

Table 4.5.13 Certification of trial operation of electromagnetic vibration devices

img

4.5.14 Certification of trial operation of mechanical vibration devices.

1 Scope:electrostatic precipitator mechanical vibration devices.

2 Certification shall meet requirements shown in Table 4.5.14.

Table 4.5.14 Certification of trial operation of mechanical vibration devices

img

4.5.15 Inspection sheet of mandatory provisions implementation of dust precipitator erection.

1 Scope:mandatory provisions implementation of electrostatic precipitators and bag filters.

2 The inspection requirements are shown in Table 4.5.15.

Table 4.5.15 Inspection sheet of mandatory provisions implementation of dust precipitator erection

img

Note:Contents in this sheet may be added or decreased according to actual situations.